Gunka İSO

 LAND COLLECTION PROJECTS

Our Services  Download service document

The following processes take place in the land collection projects conducted by our company:

  • Transferring the proprietorship data to the PC environment: updating the deed information of the project site at the PC environment.
  • Digitalizing of the sketch maps of the project site and making area control: Digitalizing of the sketch maps of the project site and determination of the parcels exceeding the area
  • Installation of ground control points: Determination of the to-be-installed triangulation, polygon and leveling points and preparation of the reconnaissance canvases
  • Preparation of Ready maps
  • Calculation of parcel value count and transferring to the PC
  • Formulation of islands
  • Arrangement of village boundaries 
  • Interviews with the farmers: In this process, the classification map, old proprietorship list (AT1), list ordered according to last name (AT2), ready field
  • Preparation of parcellation plan
  • Measurement of ground control points 
  • Island and parcel corner applications 
  • Arrangement of separation diameter
  • Registration processes
  • Arrangement of garden boundary 

© 2008 Proland
Web Design By TBM Yazılım